Site study & BOQ
Relevant site inputs, scope review and an itemised project proposal before work begins.
Renovation
Stop the leak at the cause, not the symptom.
Waterproofing work should begin with a review of the leak path, substrate, drainage, cracks, junctions and previous treatments. The recommended system, preparation, exclusions and any applicable manufacturer or workmanship terms must be stated in the proposal.
We trace a leak to its source — a junction, a slope, a failed membrane — instead of painting over the symptom.
Ask for the selected product system, preparation method and any applicable manufacturer or workmanship terms in writing.
Laterite, lime and timber restoration that respects an old Kerala home's character and materials.
Every line below is written into your BOQ with the material brand and grade specified — so what you are quoted is what arrives on site.
The same four on every job, in the same order, with the same sign-off at the end of each. Nothing starts until the stage before it is closed.
Relevant site inputs, scope review and an itemised project proposal before work begins.
Applicable drawings and documents coordinated with the appropriate registered professional and local authority.
Project execution coordinated against the agreed drawings, scope and stage records.
Final review, documented snag closure and the project-specific handover information agreed in the contract.
Share the plot, drawings and intended scope. We can then explain the information needed for a project-specific site review and itemised proposal.
Plan with clarity
Discuss the project scope with our team and request an itemised proposal and proposed schedule for review.