Commercial · Attingal
Attingal Logistics Hub
Pre-engineered warehouse and two-storey office block on the NH 66 corridor delivered in 9 months.
- 120,000 sq ft
- Promised 30 SEP 2025
- Handed over 25 SEP 2025
- Er. Viju Kumar
Industrial logistics facility featuring heavy-duty concrete flooring, pre-engineered steel framing, and a dedicated regional corporate administrative core.
- Area
- 120,000 sq ft
- Type
- PEB Warehouse + Office
- Structure
- Structural Steel
- Timeline
- 9 months
- Site head
- Er. Viju Kumar
- Status
- Completed
The constraint, and what we did about it.
Every plot has one thing that decides the whole design. This is the one that decided this build, and the structural answer we took to it.
What made this build difficult
Extremely tight 9-month delivery deadline ahead of the national highway logistics peak season.
The constraint
Design & structural decisions
Ran foundation civil works and PEB steel fabrication concurrently, accelerating onsite erection timelines by 6 weeks.
Our answer
Finished spaces.
Photographed at Attingal after handover.




What we delivered.
- PEB structural design & erection
- RCC two-storey office core
- Fire hydrants & safety systems
- Paved heavy transport yard
The schedule, kept.
- 01Civil & FoundationJAN 2025
- 02Steel ErectionMAY 2025
- 03Cladding & OfficeAUG 2025
- 04Handover25 SEP 2025Handed over
Want a home like Attingal Logistics Hub?
Book a joint site walk on your plot with our lead engineer. You leave with a fixed quote and a dated schedule.
WhatsApp us on
81299 14397Prefer to talk? Call the same number, Mon–Sat 09:00–18:30.
Homeland Civil Tech2nd Floor, Ambady Towers, Sasthamangalam, Thiruvananthapuram, Kerala 695010Residential · Commercial · Interiors